Unikey Despero SC Suspension Fertilizers

DESPERO JL NP 12-61-0+0.5MgO

DESPERO JL NP 12-61-0+0.5MgO

Highly concentrated Gel NP fertilizer Despero JL NP 12-61-0 + 0.5 MgO promotes greener leaves and controlled vegetative growth thanks to the extra magnesium it contains. The formulation supplies nitrogen for vegetative development and delivers high phosphorus required during the initial growth period.
With the complex growth promoters it contains, it helps plants withstand biotic and abiotic stress factors, promoting overall plant health. Its high phosphorus (P) content supports rapid rooting and strong early growth.

The product’s gelatinous structure maximizes retention time, lowers leaf surface tension, and facilitates stomatal opening, thereby increasing nutrient uptake. Its gel form and non-ionic character are compatible with most phytosanitary treatments, enhancing their effectiveness. Acting as a protective nutritional colloid, it prevents chemical degradation and losses due to volatilization or secondary compound formation. Completely water-soluble, even very low doses achieve optimal efficiency.

Meeting macro- and micro-nutrient needs, Despero JL NP can be applied via irrigation systems, directly to soil, or as a foliar spray. The suspension contains dense nutrients suited for fertigation or conventional application.

Guaranteed Content (% w/v)
Component Percentage
Total Nitrogen (N) 12 %
Ammonium Nitrogen (N) 12 %
Neutral Ammonium Citrate & Water-Soluble Phosphorus Pentoxide (P2O5) 61 %
Water-Soluble Phosphorus Pentoxide (P2O5) 61 %
Water-Soluble Magnesium Oxide (MgO) 0.5 %
Place of Use, Time and Dosage
Plant Name Application Period Soil Application
(cc / da)
Cotton At intervals of 15–20 days before flowering. 200 – 250
Greenhouse & Outdoor Vegetables (Tomato, Pepper, Cucumber, Eggplant, Bean, Strawberry, etc.) Before and after flowering at intervals of 15–20 days. 200 – 250
Tuberous Plants (Zucchini, Potato, Onion, etc.), Melon, Watermelon From the period before and after flowering; repeat every 15–20 days after first fruit set. 200 – 250
All Fruit Trees (Peach, Apricot, Cherry, Plum, Apple, Pear, Quince, etc.) Apply two or three times starting at the onset of development. 200 – 250
Industrial Crops (Corn, Cotton, Sunflower, etc.) At the 5–6 leaf stage; repeat every 15–20 days. 200 – 250
All Legumes (Chickpeas, Beans, Lentils, Soy, etc.) At the 5–6 leaf stage and again after 15–20 days. 200 – 250
Cereals (Wheat, Barley, Paddy, etc.) Tillering period. 200 – 250